When installing a
driveway or field entrance, a permit for a driveway installation
on the township right of way is required. No construction may take
place until a culvert has been installed.
-
Permit
applications are available at the road district office. A
drawing showing where the proposed location of driveway is
required.
-
This
year brings a change to all culvert permits. Due to the rising
costs of culverts, flared ends, gravel and labor and increase
was necessary. The refundable Bond will now be $1,000.00 per
culvert. A certified check or money order made
payable to “McHenry Township Road District”.
-
If
you blacktop over the culvert before the inspection and upon
inspection we find the culvert damaged, you may decide to
forfeit the Bond and have McHenry Township Road District
install the replacement; however, we will not repave the
driveway. Please call for an inspection before paving.
-
After
completion of the construction and restoration work, the
permit holder must call the McHenry Township Road District for
an inspection. If the culvert installation is approved, the
bond will be returned. In the past we were one of a very few
townships that did not charge an inspection fee, we now will
charge a non-refundable $150.00 inspection fee.
-
No restriction
of water flow through the ditch line is allowed (i.e.: rocks,
timbers, concrete walls, or curbs, bricks, etc.).
-
If a house or
other building is being constructed, the property owner must
obtain a driveway culvert permit before a county building
permit can be issued.
-
If driveway is
to be paved with blacktop the surface must be even with the
roadway surface. No concrete or brick past property line into
road right of way (30 feet from the center of the road).
-
If
you are planning to repave your driveway and live on a road
maintained by the Township, we will check your culvert to see
if it needs replacing. If it does need to be replaced, we will
furnish the culvert at no charge. Call the Road District for
more information 815-385-3076.
|